A project in the Gulf, a site in Africa, a posting in Asia — we ship your personal effects, tools and technical kit from your UK door to wherever the contract takes you, by air for speed or sea for the heavier loads.
Engineering work moves you to where the project is — often at short notice, often to a site rather than a city. We’ve shipped for engineers on overseas contracts from the UK since 1998, and we’re used to project timelines, mobilisation dates and getting kit to less-than-obvious addresses.
Wherever the project is, we get your belongings and kit there:
Project mobilisation dates rarely wait. If you need kit and belongings on site soon after you arrive, air freight is typically 4–10 working days, subject to space and flight availability with the carriers. For heavier loads and full households, sea freight is far cheaper but runs to weeks — roughly 4 to 12 depending on destination and sailing dates, so allow a week or two either side.
Tell us your mobilisation date and the site, and we’ll plan the shipment backwards from it.
Tell us your destination and your timeline, and we’ll come back with a quote and a realistic transit-time estimate — before you commit to anything.